Provider Name: SPRINGS AT LAKE POINTE WOODS
Provider Type: Nursing Home
Inspection Data from January 1, 2008 to present
Export Results


Survey DateInspection TypeTrack IDDeficiencySeverity and ScopeClassRequirement DescriptionCorrection Date
06/17/2025Fire/Life/SafetyZ0E1NoneNoneNoneNoneNoneNone
03/19/2025Fire/Life/SafetyT0VRNoneNoneNoneNoneNoneNone
11/15/2024ComplaintOFNONoneNoneNoneNoneNoneNone
09/19/2024ComplaintPYW3F0689J FREE OF ACCIDENT HAZARDS/SUPERVISION/DEVICES09/19/2024
09/19/2024ComplaintPYW3N0201J1RIGHT TO ADEQUATE AND APPROPRIATE HEALTH CARE09/19/2024
09/18/2024Fire/Life/SafetyPJGQNoneNoneNoneNoneNoneNone
06/13/2024ComplaintSZN0NoneNoneNoneNoneNoneNone
05/15/2024Fire/Life/SafetyRRE7K0918F3ELECTRICAL SYSTEMS - ESSENTIAL ELECTRIC SYSTEElectrical Systems - Essential Electric System Maintenance and Testing The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110. Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked and readily identifiable. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations. 6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) 06/07/2024
05/07/2024ComplaintBJK3NoneNoneNoneNoneNoneNone
04/09/2024ComplaintGFQ8CZ815 UBACKGROUND SCREENING; PROHIBITED OFFENSES04/26/2024
12345678910...